Jizoni
AI-Native Project Controls

Schedules that think ahead of
your project, not behind it.

Jizoni builds your work breakdown structure, runs the critical path, and flags the risk in your timeline before it costs you a week — real project controls, with an AI that does the analysis a senior planner would do on every single update.

The schedule is still the last thing anyone trusts

Most project schedules are built once, in a rush, then maintained by whoever has the least time to do it. Risk gets discovered in the status meeting instead of the plan. Dependencies get missed until they are on the critical path. And by the time a delay is visible in the schedule, it is already too late to absorb it.

1

Built once, trusted never

Static schedules go stale the week they are published; nobody has time to keep the logic honest.

2

Risk found too late

Slippage shows up in the status report, not the plan, so there is no float left to recover it.

3

One person holds the whole picture

Scheduling expertise lives in one planner’s head instead of the tool everyone works from.

One platform, from scope to schedule to control

Built around the actual lifecycle of a project schedule — not a task board with a Gantt view bolted on.

Dashboard

Live project health at a glance — active projects, total tasks, resource counts across all projects, and schedule adherence in one view.

WBS Editor

Build a hierarchical work breakdown structure by hand, or generate one from a plain-language project description and refine it against your own standards.

Scheduling

Interactive Gantt with critical path analysis, baselines, calendars, dependencies, assignments, and earned value — the controls layer most tools skip.

Jz-Agent

Your AI project controls assistant. Set it to a project and it has your real schedule data in context — ask what is driving the critical path or how to pull two weeks back.

Resources

Resource management and allocation across projects, with levelling recommendations that respect the crew and equipment constraints you actually have.

Reports

Progress, variance, resource utilisation, and earned value reporting — exportable for whoever needs it outside the tool.

Everything a real schedule needs, in one place

Baselines

Compare the current schedule against an approved baseline and see exactly what moved, and when.

Earned Value

EV metrics tracked against the plan — not reconstructed in a spreadsheet at month end.

Critical Path & Dependencies

Full dependency logic with automated critical path analysis and float visibility.

Calendars

Working calendars that reflect real shift patterns, weather windows, and shutdowns.

Progress Spotlight

Surface what actually moved this period instead of scrolling 100+ line items.

Jz-Filters

Cut a large schedule down to the slice you need to look at right now.

Native AI

Meet Jz-Agent

Project controls expertise, on call, with your project already in context.

Jz-Agent is Jizoni’s native AI agent. It retrieves against your actual project data — WBS, dependencies, resources, baselines, dates — so answers are grounded in your schedule, not generic project management advice. Ask why a date moved and it can point at the activity that moved it.

“Analyse the critical path and potential bottlenecks.”

“What are the top 5 risks for this project?”

“Suggest ways to optimise resource allocation.”

“How can I accelerate this timeline without adding cost?”

Built for schedules with real complexity

Jizoni holds up on the projects where a simple task list falls apart — multi-phase programmes where engineering, procurement, and construction all depend on each other and all move at once.

A 20km subsea power cable replacement between an offshore platform and a shore station, for example, runs to 100+ activities across six phases before a single cable goes in the water:

1.0  Project Management & Initiation
2.0  Engineering Phase (Preliminary → Detailed → Deliverables)
3.0  Procurement Phase (Planning → Execution → Deliverables)
4.0  Construction Phase (Pre-Construction → Onshore → Offshore)
5.0  Testing & Commissioning (Pre-Comm → Commissioning → Handover)
6.0  Project Control & Reporting (Planning → Schedule Mgmt → Reporting)

Jizoni structures that hierarchy, holds the dependency logic between phases, tracks earned value against baseline, and keeps the critical path visible the whole way through.

Built for the people who own the schedule

Project Managers

Run the plan from one place instead of stitching together a spreadsheet, a Gantt tool, and a status deck.

Program & Portfolio Leads

See risk and resource conflicts across multiple projects before they collide.

Planning & Scheduling Teams

AI-assisted WBS generation and critical path analysis without giving up control of the logic.

Built by people who run schedules for a living

Jizoni is built and owned by hQube, a project controls and engineering practice that plans, builds, and defends the schedules on capital projects — including Primavera P6 project controls for utility owners and EPC contractors. Jizoni did not come out of a product roadmap; it came out of the work. It runs on live project controls engagements today, which is why it behaves like a planner instead of a task tracker.

Already running Primavera P6? Jizoni works alongside it — P6 stays the system of record your owners and auditors expect, while Jizoni does the analysis on every update.

Start free. Upgrade when the schedule gets real.

Three tiers, priced per seat. No feature paywall on the free tier — you see the whole product, it just will not hold a full programme.

Free

$0
Try Jizoni against one real schedule.
  • 1 active project, up to 250 activities
  • WBS editor and interactive Gantt
  • Critical path and dependency logic
  • 1 baseline
  • Manual schedule updates
Start Free
Most popular

Pro

$149
per user / month — the full controls layer.
  • Unlimited active projects and activities
  • Unlimited baselines with full change history
  • Earned value and variance reporting
  • Resource levelling and allocation recommendations
  • Predictive risk analysis with mitigation options
  • 5,000 Jz-Agent messages per month
Get Started

Enterprise

Custom
Portfolio-level controls across programmes. 25 seat minimum.
  • Multi-project portfolio roll-up
  • SSO and role-based access control
  • Custom SLA and named support contact
  • Annual invoicing and purchase orders
  • Deployment in your own environment on request
Request a Proposal

See your schedule the way Jizoni sees it

Send us a project scope or an existing schedule — we will show you what Jizoni finds.